Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Bionic Training

Basel
Leisure/Culture
Text Link

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

  • Client
  • Bionic BS
    Bionic BS
  • Location
  • Basel
  • Mandate form
  • Architect
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Interior design
    Conversion/Renovation
  • Duration
  • 04.2016
    —heute
    —07.2016
    0 Days
Bionic Training

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bionic Training

Project information

Blaser Architekten realised the Bionic concept for a young start-up company from Basel with targeted and effective spatial interventions.

The conveniently located rental space on the ground floor of the 'Warteck' commercial building was divided into a reception and training room facing the street and a rear area with a lounge and high-quality changing rooms and shower cubicles with a wellness ambience. The training room with its four training machines and elegant furnishings can be seen from a large area through the shop windows and has an inviting appearance. We are delighted that the concept got off to a successful start in Basel and that we were able to open a second branch at Anfoshaus in Basel in 2018.

Partner

  • GV SIA 416 m3
  • 580
  • GF SIA 416 m2
  • 135
  • Nutzfläche m2
  • 120

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Extension to a detached house in Bottmingen built by Blaser Architekten.

Extension SFH Bottmingen

Extension to a detached house in Bottmingen built by Blaser Architekten.

Installation of a multi-space office in a square floor plan with a formerly dark centre zone.

Novartis Campus WSJ-360 5. OG

Installation of a multi-space office in a square floor plan with a formerly dark centre zone.

Refurbishment of a 19th century town house.

City villa Feierabendstrasse

Refurbishment of a 19th century town house.

Extension of an existing detached house with additional living space and access via a stair tower in the extension.

SFH Röschenz

Extension of an existing detached house with additional living space and access via a stair tower in the extension.

Residential development on the border to Allschwil with apartment block along the street and atrium houses in the inner courtyard.

Neuweilerhof residential development

Residential development on the border to Allschwil with apartment block along the street and atrium houses in the inner courtyard.

High-bay warehouse of the paint manufacturer Caparol

Production and Sales point Caparol

Tenant change of the paint manufacturer Caparol into an existing business and commercial property.

Competition for the clarification of future potentials and the development of the external space of EuroAirport Basel-Mulhouse.

EuroAirport rail link competition

Competition for the clarification of future potentials and the development of the external space of EuroAirport Basel-Mulhouse.

Study to clarify the development options, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan.

Study contract for the Bricks area

Study to clarify the development options, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan.

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Swissmetal site development

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Expansion of the Basel Technology Park in Stücki Park.

Technology Park II

Expansion of the Basel Technology Park in Stücki Park.