The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Dreispitz university quarter study contract

Münchenstein
Education
Text Link
Leisure/Culture
Text Link

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

  • Client
  • Christoph Merian Stiftung und Swiss Prime Site Immobilien
    Christoph Merian Stiftung und Swiss Prime Site Immobilien
  • Location
  • Münchenstein
  • Mandate form
  • General planner
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • New building
    Study
    Competition
  • Duration
  • 07.2021
    —heute
    —01.2022
    0 Days
Dreispitz university quarter study contract

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Dreispitz university quarter study contract

A new university quarter is to be built on the Dreispitz. It will be home to the Faculty of Law and the Faculty of Economics in the future.

In June 2021, the landowner CMS and Swiss Prime Site Immobilien, as the participating building rights holder, invited tenders for an urban planning study contract to develop the new university quarter in Dreispitz. The primary aim is to create an innovative and attractive university education campus. However, other uses such as housing, neighbourhood amenities for daily needs, restaurants, childcare facilities, leisure facilities and businesses are also to be established. A building for the Swiss Circus Centre Basel is also planned.

Together with the university, a sustainable, attractive and lively neighbourhood with high-quality and climate-relevant outdoor and green spaces is to be created. Together with the FHNW School of Art and Design and the planned FHNW School of Business, the new university site will form an actual education cluster on the Dreispitz.

The assessment panel was unanimously in favour of considering the proposals of the team led by Grafton Architects/Blaser Architekten in the study parameters as the basis for further planning steps. What particularly impressed the assessment panel about this proposal was that the character of the Dreispitz was further developed and a continuous green area was planned. Existing structures should be reused wherever possible and the disused railway tracks should be incorporated. According to the report, the planning team presents an extremely intelligent, aesthetic and sustainable approach that deals with what is already there and responds to the current challenges of people- and climate-friendly urban development.

Further planning steps and building licence negotiations are now to be prepared on the basis of the study. The new university quarter is expected to be visible from 2030 and the building will be handed over to the University of Basel as its user.

Project information

  • GV SIA 416 m3
  • 312'498
  • GF SIA 416 m2
  • 84'911
  • Designarchitekt
  • Grafton Architects
  • Visualisierung
  • Grafton Architects

Partner

  • Energie
  • Urban Systems Design
  • Landschaft
  • Westpol Landschaftsarchitektur

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Installation of the first Superdry shop in Switzerland.

Superdry Shop

Installation of the first Superdry shop in Switzerland.

Conversion and extension of a shop in the centre of Basel.

Boutique Interio

Conversion and extension of a shop in the centre of Basel.

Study to clarify the development options, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan.

Study contract for the Bricks area

Study to clarify the development options, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan.

Renovation and remodelling of an old flat with a view of the Rhine.

Apartment Mühlenberg

Renovation and remodelling of an old flat with a view of the Rhine.

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Swissmetal site development

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Two-stage study contract for the extension and refurbishment of the Bruderholz Cantonal Hospital.

Study contract for cantonal hospital

Two-stage study contract for the extension and refurbishment of the Bruderholz Cantonal Hospital.

First installation for Lonza AG in Stücki Park Basel in the head-end building of House A on Level 7.

Lonza AG

First installation for Lonza AG in Stücki Park Basel in the head-end building of House A on Level 7.

Conversion of the listed market hall site from 1928/29 with domed building and peripheral buildings.

Market hall complex

Conversion of the listed market hall site from 1928/29 with domed building and peripheral buildings.

Tenant fit-out for Credit Suisse at the Liestal railway station.

Credit Suisse Liestal

Tenant fit-out for Credit Suisse at the Liestal railway station.

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

Novartis Campus WSJ-182

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.